Buildings

TM-BE

Bespoke buildings

Roughly a third of what we build does not come out of the catalogue. If the geometry works in modules, we will engineer it.

Area
By design
Lead time
From 16 weeks
From
Quoted

Where the constraint really is

It is almost never the building. It is the lorry, the route and the crane. We run a transport and craneage study before we price anything bespoke, because a design that needs a police escort through a town centre at 3am is a different building from one that does not.

Working from your architect’s drawings

We take a scheme at RIBA Stage 3 and rationalise it into modules, then hand back a model your architect can keep developing. The design stays theirs; we engineer the manufacture.

Specification

The numbers a specifier asks for

Bespoke buildings standard specification
ItemSpecification
Maximum module width4.2 m, 4.9 m with escort
Maximum module length18.0 m
Maximum module weight32 t
StructureHot-rolled or load-bearing modular
DesignFrom your architect’s RIBA 3
BIMLevel 2, IFC and Revit exchange
Design lifeTo specification, up to 60 years
FireTo specification

Full technical specification, Revit families and test evidence are on thespecifiers page.

Also in the range

  • TM-CL

    Classroom block

    Two to sixteen teaching spaces, with circulation and WCs, ready for a September handover.

  • TM-HC

    Healthcare unit

    Consulting rooms, treatment spaces and diagnostics, built to HTM and HBN.

  • TM-OF

    Office pavilion

    Open-plan and cellular office space, single or two storey, with a permanent finish.

When do you need it open?

Start a project