TM-HC
Healthcare unit
Clinical space where the specification is not negotiable and the trust needs the beds open on a date that was set eighteen months ago.
- Area
- 300–2,200 m²
- Lead time
- 18–26 weeks
- From
- £2,850 / m²
The specification is the product
Healthcare modules are not classroom modules with different flooring. The services density is roughly three times higher, the commissioning regime is formal, and the validation evidence is part of the handover rather than an afterthought.
We build to HTM and HBN from the first drawing and we bring the trust’s authorising engineer into the factory at first-fix, so the sign-off happens against something they have seen rather than something they are being told about.
Commissioned before it leaves
Mechanical and electrical services are tested in the factory before the module is craned onto a lorry. On site we are reconnecting and re-testing rather than commissioning from scratch, which is the difference between a two-week and a six-week completion.
Specification
The numbers a specifier asks for
| Item | Specification |
|---|---|
| Module size | 3.6 m × 13.5 m × 3.6 m |
| Structure | Hot-rolled steel frame, bolted |
| Services | HTM 06-01 electrical, HTM 04-01 water |
| Ventilation | HTM 03-01 mechanical, with commissioning |
| Finishes | Welded vinyl, coved, IPS panelling |
| Infection control | Sealed junctions, wipeable throughout |
| Design life | 60 years |
| Fire | 60 minutes, sprinklered where specified |
Full technical specification, Revit families and test evidence are on thespecifiers page.
Built as
This type, on a real project
A diagnostic centre commissioned in the factory and re-tested on site
Twelve modules forming a community diagnostic centre, with HTM commissioning largely complete before the building left the plant.
860 m²Gross internal area22 weeksContract to handover12Modules
Also in the range
- TM-CL
Classroom block
Two to sixteen teaching spaces, with circulation and WCs, ready for a September handover.
- TM-OF
Office pavilion
Open-plan and cellular office space, single or two storey, with a permanent finish.
- TM-WF
Welfare and changing
Changing rooms, showers, drying rooms and mess facilities for industrial and sports sites.