Clinical space where the specification is not negotiable and the trust needs the beds open on a date that was set eighteen months ago.

Area
300–2,200 m²
Lead time
18–26 weeks
From
£2,850 / m²

The specification is the product

Healthcare modules are not classroom modules with different flooring. The services density is roughly three times higher, the commissioning regime is formal, and the validation evidence is part of the handover rather than an afterthought.

We build to HTM and HBN from the first drawing and we bring the trust’s authorising engineer into the factory at first-fix, so the sign-off happens against something they have seen rather than something they are being told about.

Commissioned before it leaves

Mechanical and electrical services are tested in the factory before the module is craned onto a lorry. On site we are reconnecting and re-testing rather than commissioning from scratch, which is the difference between a two-week and a six-week completion.

Specification

The numbers a specifier asks for

Healthcare unit standard specification
ItemSpecification
Module size3.6 m × 13.5 m × 3.6 m
StructureHot-rolled steel frame, bolted
ServicesHTM 06-01 electrical, HTM 04-01 water
VentilationHTM 03-01 mechanical, with commissioning
FinishesWelded vinyl, coved, IPS panelling
Infection controlSealed junctions, wipeable throughout
Design life60 years
Fire60 minutes, sprinklered where specified

Full technical specification, Revit families and test evidence are on thespecifiers page.

Built as

This type, on a real project

Also in the range

  • TM-CL

    Classroom block

    Two to sixteen teaching spaces, with circulation and WCs, ready for a September handover.

  • TM-OF

    Office pavilion

    Open-plan and cellular office space, single or two storey, with a permanent finish.

  • TM-WF

    Welfare and changing

    Changing rooms, showers, drying rooms and mess facilities for industrial and sports sites.

When do you need it open?

Start a project