TM-CL
Classroom block
The building most schools need and the one traditional construction is worst at delivering, because the only window to build is the six weeks nobody is in the building.
- Area
- 180–1,400 m²
- Lead time
- 14–20 weeks
- From
- £1,950 / m²
Built for the summer window
Modules are manufactured while the school is still in term, so the on-site programme is groundworks in the last fortnight of term, craneage in week one of the holidays, and fit-out and commissioning through weeks two to five. We have handed over eleven of these on the last working day before term without a single one slipping.
The critical path is the foundation design, not the building. Get us the ground investigation early and the rest is a factory schedule.
Acoustics that actually pass
BB93 is where most modular classrooms fail, usually at the junction between modules rather than in the panel build-up. Our inter-module junction is tested as an assembly, not calculated from component data, and we hand over the pre-completion test results as part of the O&M pack.
Specification
The numbers a specifier asks for
| Item | Specification |
|---|---|
| Module size | 3.6 m × 12.0 m × 3.4 m |
| Structure | Hot-rolled steel frame, bolted |
| Floor loading | 3.0 kN/m² imposed |
| Acoustics | BB93 compliant, 45 dB between spaces |
| Ventilation | Hybrid, meeting BB101 |
| Airtightness | 3.0 m³/h·m² at 50 Pa |
| Design life | 60 years |
| Fire | 60 minutes, Class A2-s1,d0 external |
Full technical specification, Revit families and test evidence are on thespecifiers page.
Built as
This type, on a real project
Sixteen teaching spaces, handed over on the last Friday of the holidays
A two-storey block replacing four failing temporary units, with the entire on-site programme inside a five-week summer holiday.
1,240 m²Gross internal area5 weeksOn site, start to handover16Teaching spaces
Also in the range
- TM-OF
Office pavilion
Open-plan and cellular office space, single or two storey, with a permanent finish.
- TM-WF
Welfare and changing
Changing rooms, showers, drying rooms and mess facilities for industrial and sports sites.